Araujo, L G, Piña, A B S, Aidar, L A G, Coelho, G O and Carvalho, M T M (2019) Recommendations and guidelines for implementing PPP projects. Built Environment Project and Asset Management, 9(02), 262–76.

  • Type: Journal Article
  • Keywords: Framework; PPP; Guidelines; Electricity sector; Infrastructure projects; Initiation phase;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-01-2018-0016
  • Abstract:
    The purpose of this paper is to propose recommendations and guidelines for the initiation phase of a public–private partnership (PPP), focusing on the electricity sector in Brazil. Design/methodology/approach A literature review allowed gathering international best practices, while brainstorming meetings and document research permitted acquiring data from the Brazilian electricity sector through a multiple case study of 12 projects. By applying benchmarking principles to compare findings, the paper proposes guidelines and recommendations, which culminated in a final framework for implementing PPPs. Findings The created framework structures a series of recommendations with application in PPP projects. Also, the paper gathers worldwide best practices, which could increase the rate of success by avoiding problems throughout the other phases of a PPP project. Research limitations/implications This paper addresses the electricity sector. Due to the singularity of such infrastructure enterprises, it is possible that the framework suggested is not entirely applicable to other enterprises, being a suggestion for future studies to perform an adherent test. Also, validating this framework is not in the scope of this project. Practical implications The use of a framework on PPP implementations brings attention to necessary efforts on previous phases of projects, which can avoid financial and technical problems, improving the reliability of PPPs. Originality/value The application of guidelines and recommendations on the electricity sector has not appeared with such focus in previous studies. The paper provides a practical manner to upgrade the process and suggests a model for implementing PPPs.

Dabarera, G, Perera, B and Rodrigo, M (2019) Suitability of public-private-partnership procurement method for road projects in Sri Lanka. Built Environment Project and Asset Management, 9(02), 199–213.

Hartwell, J C, Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(02), 302–14.

Jayasuriya, S, Zhang, G and Jing Yang, R (2019) Challenges in public private partnerships in construction industry. Built Environment Project and Asset Management, 9(02), 172–85.

Kavishe, N, Chileshe, N and Jefferson, I (2019) Public–private partnerships in Tanzanian affordable housing schemes. Built Environment Project and Asset Management, 9(02), 233–47.

Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(02), 186–98.

Oliveros-Romero, J and Aibinu, A A (2019) Ex post impact evaluation of PPP projects: an exploratory research. Built Environment Project and Asset Management, 9(02), 315–30.

Pellegrino, R, Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(02), 248–61.

Umar, A A, Zawawi, N A W A and Abdul-Aziz, A (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(02), 277–90.

Zhang, Y and Tan, W (2019) The leading small group: an institutional innovation for PPP projects in China. Built Environment Project and Asset Management, 9(02), 291–301.

Zhao, N and Ying, F (2019) Method selection: a conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(02), 214–32.